This course has been designed in such a way that you easily understand how to make an estimation and then its costing as per govt. norms .This course is consisting of :
1)DRAWING READING PART ONE
2)DRAWING READING PART TWO
3)SITE VISIT TO UNDESTAND SITE CLEANING AND EXCAVATION
4)CALCULATION FOR SITE CLEANING AND EXCAVATION
5)CALCULATION FOR SAND FILLING AND PCC FILLING
6)SITE VISIT
7)FOOTING SHUTTERING CALCULATION
8)FOOTING CONCRETE CALCULATION
9)PEDESTAL COLUMN SHUTTERING AND ITS CALCULATION
10)SITE VISIT
11)PEDESTAL COLUMN CONCRETE CALCULATION
12)BACK FILLING
13)PLINTH BEAM CONCRETE
14)PLINTH BEAM CONCRETE
15)PLINTH FILLING CALCULATION
16)PCC FILLING AND BITAMINOUS CALCULATION
17)ONE LIN BRICKWORK FOR 100 MM WALL
18) ONE LINE BRICKWORK FOR 200 MM WALL
19)DPC CALCULATION
20)BRICKWORK UPTO SILL BAND
21)SILL BAND CALCULATION (CONCRETE)
22)BRICKWORK UPTO LINTEL BEAM BOTTOM
23)LINTEL BEAM CONCRETE AND SHUTTERING
24)BRICKORK UPTO SLAB BEAM BOTTOM
25)SLAB CONCRETE AND SLAB CENTERING
26)SLAB BEAM SHUTTERING
27) SLAB BEAM CONCRETE
28)STAIRCASE SHUTTERING AND CONCRETE CALCULATION
29)SITE VISIT 01
30)SITE VISIT02
31)COLUMN SHUTTERING AND COLUMN CONCRETE
32) PARAPET COLUMN CONCRETE
33)SITE VISIT
34)BASE /PLATFORM FOR OVERHEAD WATER TANK /MUMTY
35)BRICKWORK BENEATH OVERHEAD WATER TANK/MUMTY
36)PARAPET COLUMN CALCULATIONS
37) CEILING PLASTER (6mm)
38)INNER PLASTER (12mm)
39)STAIRCASE PLASTER
40)OUTER PASTER(15mm)
41)OUTER PLASTER WITH DEDUCTION
42)MUMTY PLASTER
43)PUTTY AND PAINT CALCULATION
44)FLOOR TILES (CERAMIC TILES )
45)WALL TILES (VITRIFIED TILES )
46)SKIRTING (100 mm)
47) KOTA STONE
48)PAVER BLOCKS